The water supply in the Lorsbachstraße between the Dornbachstraße and Eichwäldchenweg is being renewed starting on Monday 21st July, 2014. The work is set to take 8 weeks.
During this time the road will by one-way travelling from the Dornbachstraße towards the Eichwäldchenweg.
The work will take place on the even-numbered side of the road, and at times it may not be possible to take vehicles in and out of drives on that side.