The gas and water mains in the Gerhart-Hauptmann-Straße are due to be replaced starting on Monday, 15th May, 2017 with the work expected to take around nine weeks. During this time access to the drives of the properties cannot always be guaranteed, although all houses will be accessible by foot.
Gerhart-Hauptmann-Strasse blocked
A crane being erected in front of house number 3 in the Gerhart-Hauptmann-Strasse will mean that the road becomes a no-through-road between 8am and 5pm on Wednesday, 9th November and Tuesday, 15th November, 2016.
Vehicles will not be able to pass this point. Pedestrians and cyclists will, however, be able to pass.
Altkönigstraße closed for two weeks
Altkönigstraße closed for two weeks
The Altkönigstraße will be closed from Friday, 2nd May until Saturday, 17th May, 2014 between the Theodor-Heuss-Straße and Borkenberg to allow for work on underground pipes to take place.
Traffic will be diverted along the Gerhart-Hauptmann-Straße, Kleiststraße and Brüder-Grimm-Straße.
The buses will, however, be able to follow their normal route.